LBE testing on GEANT, T.Ferrari, DataGrid - GEANT Collaboration, July 2 2002
(pdf)
Phase 0: service specification
Phase 1: baseline testing of implementation, study of LBE, implementation
feasibility (in GEANT and NRNs)
Phase 2: performance analysis in user-based scenario (test cases
to be identified, DataGRID testbed sites (?) - used of production
network infrastructures for testing
Phase 3: implementation of user and GEANT/NRN-based scenario, testing
on production networks if possible, preliminary lab tests where/if
needed
Joint experiments with US partners - if/when possible (QBSS)
EXPERIMENTAL RESULTS
Experimental
results of LBE testing on GEANT (Work Programme phase 3)
PRESENTATIONS AND MINUTES
LBE/Scavenger; T.Chown, TF-NGN meeting, Berlin, July 1-2 2002
(pdf)
LBE tranparency on GEANT; N.Simar, TF-NGN meeting, Berlin, July 1-2 2002
(pdf)
Minutes of the LBE BOF, TNC 2002, Limerick, Ireland